# Test Design and Risk Assessment - Validation Checklist
|
||||
|
||||
## Prerequisites
|
||||
|
||||
- [ ] Story markdown with clear acceptance criteria exists
|
||||
- [ ] PRD or epic documentation available
|
||||
- [ ] Architecture documents available (optional)
|
||||
- [ ] Requirements are testable and unambiguous
|
||||
|
||||
## Process Steps
|
||||
|
||||
### Step 1: Context Loading
|
||||
|
||||
- [ ] PRD.md read and requirements extracted
|
||||
- [ ] Epics.md or specific epic documentation loaded
|
||||
- [ ] Story markdown with acceptance criteria analyzed
|
||||
- [ ] Architecture documents reviewed (if available)
|
||||
- [ ] Existing test coverage analyzed
|
||||
- [ ] Knowledge base fragments loaded (risk-governance, probability-impact, test-levels, test-priorities)
|
||||
|
||||
### Step 2: Risk Assessment
|
||||
|
||||
- [ ] Genuine risks identified (not just features)
|
||||
- [ ] Risks classified by category (TECH/SEC/PERF/DATA/BUS/OPS)
|
||||
- [ ] Probability scored (1-3 for each risk)
|
||||
- [ ] Impact scored (1-3 for each risk)
|
||||
- [ ] Risk scores calculated (probability × impact)
|
||||
- [ ] High-priority risks (score ≥6) flagged
|
||||
- [ ] Mitigation plans defined for high-priority risks
|
||||
- [ ] Owners assigned for each mitigation
|
||||
- [ ] Timelines set for mitigations
|
||||
- [ ] Residual risk documented
|
||||
|
||||
### Step 3: Coverage Design
|
||||
|
||||
- [ ] Acceptance criteria broken into atomic scenarios
|
||||
- [ ] Test levels selected (E2E/API/Component/Unit)
|
||||
- [ ] No duplicate coverage across levels
|
||||
- [ ] Priority levels assigned (P0/P1/P2/P3)
|
||||
- [ ] P0 scenarios meet strict criteria (blocks core + high risk + no workaround)
|
||||
- [ ] Data prerequisites identified
|
||||
- [ ] Tooling requirements documented
|
||||
- [ ] Execution order defined (smoke → P0 → P1 → P2/P3)
|
||||
|
||||
### Step 4: Deliverables Generation
|
||||
|
||||
- [ ] Risk assessment matrix created
|
||||
- [ ] Coverage matrix created
|
||||
- [ ] Execution order documented
|
||||
- [ ] Resource estimates calculated
|
||||
- [ ] Quality gate criteria defined
|
||||
- [ ] Output file written to correct location
|
||||
- [ ] Output file uses template structure
|
||||
|
||||
## Output Validation
|
||||
|
||||
### Risk Assessment Matrix
|
||||
|
||||
- [ ] All risks have unique IDs (R-001, R-002, etc.)
|
||||
- [ ] Each risk has category assigned
|
||||
- [ ] Probability values are 1, 2, or 3
|
||||
- [ ] Impact values are 1, 2, or 3
|
||||
- [ ] Scores calculated correctly (P × I)
|
||||
- [ ] High-priority risks (≥6) clearly marked
|
||||
- [ ] Mitigation strategies specific and actionable
|
||||
|
||||
### Coverage Matrix
|
||||
|
||||
- [ ] All requirements mapped to test levels
|
||||
- [ ] Priorities assigned to all scenarios
|
||||
- [ ] Risk linkage documented
|
||||
- [ ] Test counts realistic
|
||||
- [ ] Owners assigned where applicable
|
||||
- [ ] No duplicate coverage (same behavior at multiple levels)
|
||||
|
||||
### Execution Order
|
||||
|
||||
- [ ] Smoke tests defined (<5 min target)
|
||||
- [ ] P0 tests listed (<10 min target)
|
||||
- [ ] P1 tests listed (<30 min target)
|
||||
- [ ] P2/P3 tests listed (<60 min target)
|
||||
- [ ] Order optimizes for fast feedback
|
||||
|
||||
### Resource Estimates
|
||||
|
||||
- [ ] P0 hours calculated (count × 2 hours)
|
||||
- [ ] P1 hours calculated (count × 1 hour)
|
||||
- [ ] P2 hours calculated (count × 0.5 hours)
|
||||
- [ ] P3 hours calculated (count × 0.25 hours)
|
||||
- [ ] Total hours summed
|
||||
- [ ] Days estimate provided (hours / 8)
|
||||
- [ ] Estimates include setup time
|
||||
|
||||
### Quality Gate Criteria
|
||||
|
||||
- [ ] P0 pass rate threshold defined (should be 100%)
|
||||
- [ ] P1 pass rate threshold defined (typically ≥95%)
|
||||
- [ ] High-risk mitigation completion required
|
||||
- [ ] Coverage targets specified (≥80% recommended)
|
||||
|
||||
## Quality Checks
|
||||
|
||||
### Evidence-Based Assessment
|
||||
|
||||
- [ ] Risk assessment based on documented evidence
|
||||
- [ ] No speculation on business impact
|
||||
- [ ] Assumptions clearly documented
|
||||
- [ ] Clarifications requested where needed
|
||||
- [ ] Historical data referenced where available
|
||||
|
||||
### Risk Classification Accuracy
|
||||
|
||||
- [ ] TECH risks are architecture/integration issues
|
||||
- [ ] SEC risks are security vulnerabilities
|
||||
- [ ] PERF risks are performance/scalability concerns
|
||||
- [ ] DATA risks are data integrity issues
|
||||
- [ ] BUS risks are business/revenue impacts
|
||||
- [ ] OPS risks are deployment/operational issues
|
||||
|
||||
### Priority Assignment Accuracy
|
||||
|
||||
- [ ] P0: Truly blocks core functionality
|
||||
- [ ] P0: High-risk (score ≥6)
|
||||
- [ ] P0: No workaround exists
|
||||
- [ ] P1: Important but not blocking
|
||||
- [ ] P2/P3: Nice-to-have or edge cases
|
||||
|
||||
### Test Level Selection
|
||||
|
||||
- [ ] E2E used only for critical paths
|
||||
- [ ] API tests cover complex business logic
|
||||
- [ ] Component tests for UI interactions
|
||||
- [ ] Unit tests for edge cases and algorithms
|
||||
- [ ] No redundant coverage
|
||||
|
||||
## Integration Points
|
||||
|
||||
### Knowledge Base Integration
|
||||
|
||||
- [ ] risk-governance.md consulted
|
||||
- [ ] probability-impact.md applied
|
||||
- [ ] test-levels-framework.md referenced
|
||||
- [ ] test-priorities-matrix.md used
|
||||
- [ ] Additional fragments loaded as needed
|
||||
|
||||
### Status File Integration
|
||||
|
||||
- [ ] bmm-workflow-status.md exists
|
||||
- [ ] Test design logged in Quality & Testing Progress
|
||||
- [ ] Epic number and scope documented
|
||||
- [ ] Completion timestamp recorded
|
||||
|
||||
### Workflow Dependencies
|
||||
|
||||
- [ ] Can proceed to `atdd` workflow with P0 scenarios
|
||||
- [ ] Can proceed to `automate` workflow with full coverage plan
|
||||
- [ ] Risk assessment informs `gate` workflow criteria
|
||||
- [ ] Integrates with `ci` workflow execution order
|
||||
|
||||
## Completion Criteria
|
||||
|
||||
**All must be true:**
|
||||
|
||||
- [ ] All prerequisites met
|
||||
- [ ] All process steps completed
|
||||
- [ ] All output validations passed
|
||||
- [ ] All quality checks passed
|
||||
- [ ] All integration points verified
|
||||
- [ ] Output file complete and well-formatted
|
||||
- [ ] Team review scheduled (if required)
|
||||
|
||||
## Post-Workflow Actions
|
||||
|
||||
**User must complete:**
|
||||
|
||||
1. [ ] Review risk assessment with team
|
||||
2. [ ] Prioritize mitigation for high-priority risks (score ≥6)
|
||||
3. [ ] Allocate resources per estimates
|
||||
4. [ ] Run `atdd` workflow to generate P0 tests
|
||||
5. [ ] Set up test data factories and fixtures
|
||||
6. [ ] Schedule team review of test design document
|
||||
|
||||
**Recommended next workflows:**
|
||||
|
||||
1. [ ] Run `atdd` workflow for P0 test generation
|
||||
2. [ ] Run `framework` workflow if not already done
|
||||
3. [ ] Run `ci` workflow to configure pipeline stages
|
||||
|
||||
## Rollback Procedure
|
||||
|
||||
If workflow fails:
|
||||
|
||||
1. [ ] Delete output file
|
||||
2. [ ] Review error logs
|
||||
3. [ ] Fix missing context (PRD, architecture docs)
|
||||
4. [ ] Clarify ambiguous requirements
|
||||
5. [ ] Retry workflow
|
||||
|
||||
## Notes
|
||||
|
||||
### Common Issues
|
||||
|
||||
**Issue**: Too many P0 tests
|
||||
|
||||
- **Solution**: Apply strict P0 criteria - must block core AND high risk AND no workaround
|
||||
|
||||
**Issue**: Risk scores all high
|
||||
|
||||
- **Solution**: Differentiate between high-impact (3) and degraded (2) impacts
|
||||
|
||||
**Issue**: Duplicate coverage across levels
|
||||
|
||||
- **Solution**: Use test pyramid - E2E for critical paths only
|
||||
|
||||
**Issue**: Resource estimates too high
|
||||
|
||||
- **Solution**: Invest in fixtures/factories to reduce per-test setup time
|
||||
|
||||
### Best Practices
|
||||
|
||||
- Base risk assessment on evidence, not assumptions
|
||||
- High-priority risks (≥6) require immediate mitigation
|
||||
- P0 tests should cover <10% of total scenarios
|
||||
- Avoid testing same behavior at multiple levels
|
||||
- Include smoke tests (P0 subset) for fast feedback
|
||||
|
||||
---
|
||||
|
||||
**Checklist Complete**: Sign off when all items validated.
|
||||
|
||||
**Completed by:** **\*\***\_\_\_**\*\***
|
||||
**Date:** **\*\***\_\_\_**\*\***
|
||||
**Epic:** **\*\***\_\_\_**\*\***
|
||||
**Notes:** \***\*\*\*\*\***\*\*\***\*\*\*\*\***\_\_\_\***\*\*\*\*\***\*\*\***\*\*\*\*\***
|
||||