bmad 分析师工作
This commit is contained in:
		
							
								
								
									
										43
									
								
								bmad/bmm-workflow-status.yaml
									
									
									
									
									
										Normal file
									
								
							
							
						
						
									
										43
									
								
								bmad/bmm-workflow-status.yaml
									
									
									
									
									
										Normal file
									
								
							@@ -0,0 +1,43 @@
 | 
			
		||||
# Workflow Status Template
 | 
			
		||||
# This tracks progress through phases 1-3 of the BMM methodology
 | 
			
		||||
# Phase 4 (Implementation) is tracked separately in sprint-status.yaml
 | 
			
		||||
 | 
			
		||||
# generated: 2025年11月1日星期六
 | 
			
		||||
# project: pig-farm-controller
 | 
			
		||||
# project_type: software
 | 
			
		||||
# project_level: 0
 | 
			
		||||
# field_type: brownfield
 | 
			
		||||
# workflow_path: brownfield-level-0.yaml
 | 
			
		||||
 | 
			
		||||
# STATUS DEFINITIONS:
 | 
			
		||||
# ==================
 | 
			
		||||
# Initial Status (before completion):
 | 
			
		||||
#   - required: Must be completed to progress
 | 
			
		||||
#   - optional: Can be completed but not required
 | 
			
		||||
#   - recommended: Strongly suggested but not required
 | 
			
		||||
#   - conditional: Required only if certain conditions met (e.g., if_has_ui)
 | 
			
		||||
#
 | 
			
		||||
# Completion Status:
 | 
			
		||||
#   - {file-path}: File created/found (e.g., "docs/product-brief.md")
 | 
			
		||||
#   - skipped: Optional/conditional workflow that was skipped
 | 
			
		||||
 | 
			
		||||
generated: "2025年11月1日星期六"
 | 
			
		||||
project: "pig-farm-controller"
 | 
			
		||||
project_type: "software"
 | 
			
		||||
project_level: "0"
 | 
			
		||||
field_type: "brownfield"
 | 
			
		||||
workflow_path: "brownfield-level-0.yaml"
 | 
			
		||||
 | 
			
		||||
workflow_status: "
 | 
			
		||||
  # Prerequisite: Documentation
 | 
			
		||||
  document-project: bmad/deep-dive-deletion-logic.md
 | 
			
		||||
 | 
			
		||||
  # Phase 1: Analysis
 | 
			
		||||
  brainstorm-project: optional
 | 
			
		||||
 | 
			
		||||
  # Phase 2: Planning
 | 
			
		||||
  tech-spec: required
 | 
			
		||||
 | 
			
		||||
  # Phase 4: Implementation
 | 
			
		||||
  sprint-planning: required
 | 
			
		||||
"
 | 
			
		||||
		Reference in New Issue
	
	Block a user