Files
pig-farm-controller/bmad/bmm/workflows/workflow-status/paths/brownfield-level-4.yaml
2025-11-01 19:22:39 +08:00

89 lines
2.6 KiB
YAML

# Brownfield Level 4 - Enterprise Scale Changes to Existing System
# 40+ stories, major expansion of existing enterprise system
project_type: "software"
level: 4
field_type: "brownfield"
description: "Enterprise scale expansion of existing system"
phases:
- prerequisite: true
name: "Documentation"
conditional: "if_undocumented"
note: "NOT a phase - prerequisite for brownfield without docs OR post-completion cleanup. Critical for enterprise-scale changes"
workflows:
- id: "document-project"
required: true
agent: "analyst"
command: "document-project"
output: "Comprehensive project documentation"
purpose: "Understand existing codebase before planning OR create superior final docs after Phase 4"
- phase: 1
name: "Analysis"
required: true
workflows:
- id: "brainstorm-project"
recommended: true
agent: "analyst"
command: "brainstorm-project"
- id: "research"
required: true
agent: "analyst"
command: "research"
note: "Research existing system architecture deeply"
- id: "product-brief"
required: true
agent: "analyst"
command: "product-brief"
note: "Strategic brief for major expansion"
- phase: 2
name: "Planning"
required: true
workflows:
- id: "prd"
required: true
agent: "pm"
command: "prd"
output: "Comprehensive PRD considering existing system"
- id: "validate-prd"
optional: true
agent: "pm"
command: "validate-prd"
- id: "create-design"
required: true
agent: "ux-designer"
command: "create-design"
note: "Multiple UI/UX specifications"
- phase: 3
name: "Solutioning"
required: true
workflows:
- id: "create-architecture"
required: true
agent: "architect"
command: "create-architecture"
output: "Architecture for system expansion"
note: "Must maintain backward compatibility"
- id: "validate-architecture"
optional: true
agent: "architect"
command: "validate-architecture"
- id: "solutioning-gate-check"
required: true
agent: "architect"
command: "solutioning-gate-check"
note: "Critical validation before major changes"
- phase: 4
name: "Implementation"
required: true
workflows:
- id: "sprint-planning"
required: true
agent: "sm"
command: "sprint-planning"
note: "Creates sprint plan with all stories - subsequent work tracked in sprint plan output, not workflow-status"