Files
pig-farm-controller/bmad/bmm/workflows/3-solutioning/solutioning-gate-check
2025-11-01 19:22:39 +08:00
..
2025-11-01 19:22:39 +08:00
2025-11-01 19:22:39 +08:00
2025-11-01 19:22:39 +08:00
2025-11-01 19:22:39 +08:00
2025-11-01 19:22:39 +08:00
2025-11-01 19:22:39 +08:00

Implementation Ready Check Workflow

Overview

The Implementation Ready Check workflow provides a systematic validation of all planning and solutioning artifacts before transitioning from Phase 3 (Solutioning) to Phase 4 (Implementation) in the BMad Method. This workflow ensures that PRDs, architecture documents, and story breakdowns are properly aligned with no critical gaps or contradictions.

Purpose

This workflow is designed to:

  • Validate Completeness: Ensure all required planning documents exist and are complete
  • Verify Alignment: Check that PRD, architecture, and stories are cohesive and aligned
  • Identify Gaps: Detect missing stories, unaddressed requirements, or sequencing issues
  • Assess Risks: Find contradictions, conflicts, or potential implementation blockers
  • Provide Confidence: Give teams confidence that planning is solid before starting development

When to Use

This workflow should be invoked:

  • At the end of Phase 3 (Solutioning) for Level 2-4 projects
  • Before beginning Phase 4 (Implementation)
  • After significant planning updates or architectural changes
  • When validating readiness for Level 0-1 projects (simplified validation)

Project Level Adaptations

The workflow adapts its validation based on project level:

Level 0-1 Projects

  • Validates tech spec and simple stories only
  • Checks internal consistency and basic coverage
  • Lighter validation appropriate for simple projects

Level 2 Projects

  • Validates PRD, tech spec (with embedded architecture), and stories
  • Ensures PRD requirements are fully covered
  • Verifies technical approach aligns with business goals

Level 3-4 Projects

  • Full validation of PRD, architecture document, and comprehensive stories
  • Deep cross-reference checking across all artifacts
  • Validates architectural decisions don't introduce scope creep
  • Checks UX artifacts if applicable

How to Invoke

Via Scrum Master Agent

*solutioning-gate-check

Direct Workflow Invocation

workflow solutioning-gate-check

Expected Inputs

The workflow will automatically search your project's output folder for:

  • Product Requirements Documents (PRD)
  • Architecture documents
  • Technical Specifications
  • Epic and Story breakdowns
  • UX artifacts (if applicable)

No manual input file specification needed - the workflow discovers documents automatically.

Generated Output

The workflow produces a comprehensive Implementation Readiness Report containing:

  1. Executive Summary - Overall readiness status
  2. Document Inventory - What was found and reviewed
  3. Alignment Validation - Cross-reference analysis results
  4. Gap Analysis - Missing items and risks identified
  5. Findings by Severity - Critical, High, Medium, Low issues
  6. Recommendations - Specific actions to address issues
  7. Readiness Decision - Ready, Ready with Conditions, or Not Ready

Output Location: {output_folder}/implementation-readiness-report-{date}.md

Workflow Steps

  1. Initialize - Get current workflow status and project level
  2. Document Discovery - Find all planning artifacts
  3. Deep Analysis - Extract requirements, decisions, and stories
  4. Cross-Reference Validation - Check alignment between all documents
  5. Gap and Risk Analysis - Identify issues and conflicts
  6. UX Validation (optional) - Verify UX concerns are addressed
  7. Generate Report - Compile comprehensive readiness assessment
  8. Status Update (optional) - Offer to advance workflow to next phase

Validation Criteria

The workflow uses systematic validation rules adapted to each project level:

  • Document completeness and quality
  • Requirement to story traceability
  • Architecture to implementation alignment
  • Story sequencing and dependencies
  • Greenfield project setup coverage
  • Risk identification and mitigation

For projects using the new architecture workflow (decision-architecture.md), additional validations include:

  • Implementation patterns defined for consistency
  • Technology versions verified and current
  • Starter template initialization as first story
  • UX specification alignment (if provided)

Special Features

Intelligent Adaptation

  • Automatically adjusts validation based on project level
  • Recognizes when UX workflow is active
  • Handles greenfield vs. brownfield projects differently

Comprehensive Coverage

  • Validates not just presence but quality and alignment
  • Checks for both gaps and gold-plating
  • Ensures logical story sequencing

Actionable Output

  • Provides specific, actionable recommendations
  • Categorizes issues by severity
  • Includes positive findings and commendations

Integration with BMad Method

This workflow integrates seamlessly with the BMad Method workflow system:

  • Uses workflow-status to understand project context
  • Can update workflow status to advance to next phase
  • Follows standard BMad document naming conventions
  • Searches standard output folders automatically

Troubleshooting

Documents Not Found

  • Ensure documents are in the configured output folder
  • Check that document names follow BMad conventions
  • Verify workflow-status is properly configured

Validation Too Strict

  • The workflow adapts to project level automatically
  • Level 0-1 projects get lighter validation
  • Consider if your project level is set correctly

Report Too Long

  • Focus on Critical and High priority issues first
  • Use the executive summary for quick decisions
  • Review detailed findings only for areas of concern

Support

For issues or questions about this workflow:

  • Consult the BMad Method documentation
  • Check the SM agent for workflow guidance
  • Review validation-criteria.yaml for detailed rules

This workflow is part of the BMad Method v6-alpha suite of planning and solutioning tools