564 B
564 B
Engineering Backlog
This backlog collects cross-cutting or future action items that emerge from reviews and planning.
Routing guidance:
- Use this file for non-urgent optimizations, refactors, or follow-ups that span multiple stories/epics.
- Must-fix items to ship a story belong in that story’s
Tasks / Subtasks. - Same-epic improvements may also be captured under the epic Tech Spec
Post-Review Follow-upssection.
| Date | Story | Epic | Type | Severity | Owner | Status | Notes |
|---|